Cottonwoods Connection

The Cottonwoods Connection project is a joint venture between the Metropolitan Water District of Salt Lake & Sandy and Salt Lake City Department of Public Utilities.

The Cottonwoods Connection will connect the water supplies of both the Big and Little Cottonwood Water Treatment Plants. This allows for untreated water to be transferred to either plant for treatment. Thus, if either plant needs to be reduced in capacity or taken off-line as they are being rebuilt, there will still be continuous water supply during the construction. This will also save 24,000 acre-feet annually of storage in Deer Creek Reservoir during construction of the Big Cottonwood Water Treatment Plant—equivalent to fulfilling the water needs of approximately 110,000 people.

The construction of Cottonwoods Connection involves three major pipelines:

CC1

BCWTP to SLAR at Ft. Union Blvd.: A 36-inch diameter welded steel pipe within the public right-of-way, crossing Wasatch Blvd. and designed to withstand earthquakes.

CC2

LCWTP Campus to SLAR: A 36-inch diameter welded steel pipe contained within the District’s property.

SLAR

Parallel to SLA: A 72-inch to 60-inch diameter welded steel pipe, 100% contained within the existing SLA easement.

Key Elements:

Add new steel pipeline parallel to existing Salt Lake Aqueduct

Replace the capacity of the existing
Little Cottonwood Conduit pipeline

Protect against
seismic activity

Optimize the use
of limited water resources

Create long-term resiliency to
overall water system

Key Elements:

Add new steel pipeline parallel to existing Salt Lake Aqueduct

Replace the capacity of the existing Little Cottonwood Conduit pipeline

Protect against
seismic activity

Optimize the use
of limited water resources

Create long-term resiliency tooverall water system

Big and Little Cottonwood Water Treatment Plants

The Big Cottonwood Water Treatment Plant and the Little Cottonwood Water Treatment Plant were built in the 1960s with the intention of bringing the community drinking water. Although they have served their purpose well, age-related issues have made reconstruction essential to address seismic vulnerabilities and meet water supply needs of the area. Both plants are slated for major reconstruction within the next 10 years.
Salt Lake Aqueduct Resiliency

The Salt Lake Aqueduct, constructed in the 1940s, serves as a primary drinking water supply for Salt Lake Valley. Although the 84-inch diameter pipe was designed and constructed to the highest standards of its time, it does not meet modern seismic resiliency standards. This project will add a parallel aqueduct for hazard resiliency and refurbish the existing aqueduct to extend its service life.

Little Cottonwood Conduit

Constructed in the 1930s, the Little Cottonwood Conduit has served Salt Lake City’s water needs for nearly a century and now needs retirement and repurposing. The LCC capacity will be replaced by the Cottonwoods Connection pipeline once the two treatment plants are reconstructed.

Stay Informed!

To stay informed about the progress of the MWDSLS project and receive regular updates, we invite you to join our mailing list. By subscribing, you will receive timely information about project milestones, significant developments, and other relevant announcements.

Thank you for your continued interest in the Cottonwoods Connection project. We value your support and look forward to sharing further updates with you as we move forward. Should you have any questions or require additional information, please feel free to reach out to us.


By submitting your email address, you are consenting to receive emails from Cottonwoods Connection. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email.

Project Partners

Ft. Union Blvd. is closed at the intersection of Ft. Union Blvd. and Nutree Dr.

What to expect during construction:

    • • Fort Union from 3000 East to Wasatch Blvd. will be closed to through traffic. Please follow posted detour signs.
      •   • Local businesses are open; access from Wasatch Blvd.

      • Access to Fort Union Blvd. from Nutree Dr. will be closed.

    • • Local residents will have access on either side of Nutree Dr.

• Expect daytime construction and occasional weekend work.

For questions about the project, contact the project team:

385-512-4747